TAR Scheduler

Dedicated turnaround planning and execution tool with scope-of-work management, work package breakdown, permit-to-work integration, and critical path compression.

Module 09 · Overview

TAR Scheduler

TAR Scheduler is built specifically for the highest-stakes maintenance event in refining: the turnaround. Where a generic project tool fails, this module excels — with scope-of-work management, work package breakdown by unit and discipline, permit-to-work integration, critical path compression, daily progress tracking, and production deferral calculation ($/day of extended shutdown). Every extra day a TAR runs costs $500K–$3M in lost production. This tool gives planners the visibility to compress that path.

Why It Wins

A TAR is not a project — it is a controlled emergency with a fixed window. Every extra day costs $500K–$3M in lost production. TAR planners live in spreadsheets and MS Project with no tool that understands permit-to-work sequencing, scaffold sharing conflicts, or shutdown-specific critical path logic.

Built For
MaintenanceOperationsManagement
Capabilities

Full Capability Set

Every capability included in TAR Scheduler.

Scope & Work Packages
Scope-of-work managementWork package breakdown by unitDiscipline-based work splitPre-TAR engineering trackingMaterials kitting statusSpare parts forecastLong-lead equipment trackingVendor work package integration
Permit-to-Work
Permit-to-work sequencingHot-work / cold-work conflictsConfined-space entry trackingLockout-tagout managementScaffold sharing conflictsCrane lift coordinationEnergy isolation trackingSafe-system-of-work integration
Critical Path & Compression
Shutdown-specific critical pathDaily critical path updateCompression opportunity flaggingResource levelingFloat erosion alertsDaily progress trackingBurn-rate trackingEarned-value for TARs
Cost & Production Impact
Cost vs. budget burn rateProduction deferral calculation$/day extension costRestart sequence planningPost-TAR yield rampTAR ROI trackingScope creep alertsLessons learned capture
Use Cases

TAR Scheduler in Action

Scenario
FCC turnaround execution
A 28-day FCC TAR is in flight. TAR Scheduler tracks scope, daily progress, permits issued, scaffold conflicts, and production deferral. The TAR director sees a real-time view of float, cost burn, and any path-compression opportunities.
Scenario
Pre-TAR planning & readiness
Six months before the TAR, the team is building work packages, kitting materials, and tracking long-lead equipment. The tool ensures everything converges in time — and flags scope changes before they become schedule killers.
Scenario
TAR ROI & lessons learned
Post-TAR, every cost variance, every schedule slippage, and every safety event is captured for the next TAR. The institutional knowledge stays with the company, not with the contractor that demobilized.

See TAR Scheduler on Your Refinery

Request a personalized demo. We will walk through TAR Scheduler on your refinery's actual configuration.